For AI teams buying compute
A new data center waits years for power. Perimeter fits data-center-grade GPUs into rooms that already have it, inside buildings in your city, and runs them for you.
For building owners
Most commercial buildings were wired for a peak they no longer reach. Perimeter leases one floor of that spare capacity, installs and runs the GPUs, pays for their electricity on a submeter, and shares the revenue.
You are standing in the room. Scroll to step outside.
Online fast
This is an Inference Hub: one floor of an existing building. The power, the cooling and the shell were in place before the GPUs arrived, so a site goes from handshake to deployed in 6 to 12 weeks, not years.
The room
Rack kits go into existing mechanical space, at 1 to 20 MW per building. Perimeter installs them, runs them and pays for the power they draw. Your team does not touch it.
Close by
A round trip from them to these GPUs takes 3 ms. That is the whole distance: a few streets.
The city
AI teams pay to run close to their users. Perimeter sells them compute from your building and shares that revenue with you.
Kept running
Perimeter sets up, watches and repairs every GPU, so your team never visits a building. Perimeter Relay routes and balances your inference across the sites in a city, and across regions.
Kept running
Your building joins a network that Perimeter runs as one system. The same team monitors and maintains every site, yours included.
The alternative
Same hardware, 70 ms for every round trip. From far enough back to see both, your city is a few blocks at the edge of the frame.
The country
Your building is already connected. After years of efficiency work, buildings like it use 30% to 60% less power than they were wired for.
What it costs you
Round trips × round-trip time, nothing else. The model and tool work is the same on both lines, so it is left out. Both lines are drawn at the same speed, so the far one takes about 23 times as long.
The capacity
At the ratio Perimeter has stated: 0.5 MW serves about 240 GPUs. Perimeter pays for the hardware, the installation and the electricity the GPUs use.
From handshake to a deployed site, because the power was already there.
Round trip across town, against 70 ms to GPUs 2,400 mi away.
The team ran GPU infrastructure at Lambda and HPE, and engineered commercial buildings at Tishman Speyer and Trane.
Capacity per building. Rack kits go into existing mechanical space, not leasable floors.
How far efficiency work has cut power use in buildings still wired for their original peak.
To a reply with next steps, once you describe your building's power, cooling and space.
Back where you started
Tell us the workload, the city and the date. We will tell you which building.
Back where you started
Tell us about your building's power, cooling and space. You will hear back within 48 hours.