Perimeter Compute
Show this page for
Request GPUs Check your building

For AI teams buying compute

GPUs in weeks, in the same city as your users.

A new data center waits years for power. Perimeter fits data-center-grade GPUs into rooms that already have it, inside buildings in your city, and runs them for you.

6 to 12 weeks
to a deployed site
3 ms
round trip across town
Run by Perimeter
set up, watched, repaired

For building owners

Your building already has the power.

Most commercial buildings were wired for a peak they no longer reach. Perimeter leases one floor of that spare capacity, installs and runs the GPUs, pays for their electricity on a submeter, and shares the revenue.

1 to 20 MW
per building
48 hours
to a reply with next steps
Paid by Perimeter
hardware, fit-out, power

You are standing in the room. Scroll to step outside.

Online fast

The power was already here.

This is an Inference Hub: one floor of an existing building. The power, the cooling and the shell were in place before the GPUs arrived, so a site goes from handshake to deployed in 6 to 12 weeks, not years.

The room

It fits in space you cannot lease.

Rack kits go into existing mechanical space, at 1 to 20 MW per building. Perimeter installs them, runs them and pays for the power they draw. Your team does not touch it.

Close by

Your users are across town.

A round trip from them to these GPUs takes 3 ms. That is the whole distance: a few streets.

The city

The buyers are a few streets away.

AI teams pay to run close to their users. Perimeter sells them compute from your building and shares that revenue with you.

Kept running

Then we keep them running.

Perimeter sets up, watches and repairs every GPU, so your team never visits a building. Perimeter Relay routes and balances your inference across the sites in a city, and across regions.

Kept running

One operator across the city.

Your building joins a network that Perimeter runs as one system. The same team monitors and maintains every site, yours included.

The alternative

The usual alternative is 2,400 mi away.

Same hardware, 70 ms for every round trip. From far enough back to see both, your city is a few blocks at the edge of the frame.

The country

A new data center waits years for power.

Your building is already connected. After years of efficiency work, buildings like it use 30% to 60% less power than they were wired for.

What it costs you

Now multiply by every call your agent makes.

Time on the wire for one agent task

1,000
GPUs 2,400 mi away70 ms × 1,000 = 70.0 s
GPUs across town, on Perimeter3 ms × 1,000 = 3.0 s

Round trips × round-trip time, nothing else. The model and tool work is the same on both lines, so it is left out. Both lines are drawn at the same speed: the wait you just watched is the difference.

The capacity

What your spare capacity can run.

GPUs your building could power

2 MW
Spare electrical capacity2 MW
GPUs it can powerabout 960

At the ratio Perimeter has stated: 0.5 MW serves about 240 GPUs. Perimeter pays for the hardware, the installation and the electricity the GPUs use.

6 to 12 weeks

From handshake to a deployed site, because the power was already there.

3 ms

Round trip across town, against 70 ms to GPUs 2,400 mi away.

Built by operators

The team ran GPU infrastructure at Lambda and HPE, and engineered commercial buildings at Tishman Speyer and Trane.

1 to 20 MW

Capacity per building. Rack kits go into existing mechanical space, not leasable floors.

30% to 60%

How far efficiency work has cut power use in buildings still wired for their original peak.

48 hours

To a reply with next steps, once you describe your building's power, cooling and space.

Request GPUsHow Perimeter measures this
Check your buildingHow the lease works